Because APEX houses its engineering, fabrication and service businesses in one location, we are able to respond to our customer’s needs with innovative techniques that result in products and services that are produced more quickly, cost less and are of higher quality than our competitors. Please click on the links below to see specific examples of how APEX responded to these customers unique demands:

OLYMPUS DIGITAL CAMERA

World War II Memorial, Washington DC

In 2001, APEX Piping Systems, Inc was honored to be selected as one of the contractors for The National World War II Memorial in Washington D.C. Our work consisted of the fabrication of the stainless steel armatures to support the eight monumental bronze eagles and two laurel wreaths, in addition to their installation in the Atlantic and Pacific Pavilions of the Memorial, where they can be seen today.

FIND OUT MORE
mechserv1

Magellan Expansion Project, Wilmington

Tank Farm piping to 11 new and 5 existing tanks; Manifold and pump rack piping; ASME Pig Launcher and receiver; Vapor recovery system; Fire Suppression System for new docks; 8 Bay truck loading rack; Structural steel supports; Concrete, civil and foundations; Testing and start-up

FIND OUT MORE
muddrum

Boiler Mud Drum Replacement

Capital project to facilitate the partial re-tubing of an A-Frame type boiler manufactured in 1961 along with the removal and reinstallation of new inner and outer casing and replacement of the boiler refractory and insulating firebrick.

FIND OUT MORE
13240583_10154198157853832_3284902715582073883_n

Heating Coils: Eliminating 200 Butt Welds

Fabricated 2 of these 40' diameter coils from 3500' of pipe, without using a single fitting, in less than 6 weeks

FIND OUT MORE