Boiler Retubing and Mud Drum Replacement
A Fortune 500 client required the retubing of their No. 3 Boiler. It also required the removal and reinstallation of new inner and outer casings, and replacement of the boiler refractory and insulating firebrick. See the APEX solution, including replacing 562 tubes, fabricating a new mud drum, and delivering and installing the mud drum before the upcoming cold season. Download to read it now!
Download the Case Study Now
This Case Study takes a closer look at our role in boiler retubing and mud drum replacement for a Fortune 500 client and the results of our process and execution strategy.
• 562 new tubes to be replaced
• New mud drum fabricated, drilled, and delivered to the Client’s facility
• Boiler refractory and insulating firebrick replaced during the tube installation
About APEX
APEX Mechanical & Fabrication is the preferred supplier of mechanical services and shop fabrication in the region that provides excellent work and rewarding career opportunities. We’re recognized for superior safety programs, consistent quality output, and our efficient end-to-end approach that’s driven by our team’s dedication to service. Our work and approach are proven to optimize the cycle of cost, safety, quality, and schedule for our clients.