At the Peak of Excellence™

sales@apexpiping.com

Case Study

DuPont Semiconductor Production Line Expansion

As part of DuPont’s estimated $50 million investment to grow its semiconductor operations and create new jobs in Delaware, APEX supported the expansion of a critical production line within an existing facility, installing all mechanical and process utilities for a converted warehouse production space. The project required delivering complex process utilities within aggressive timelines and demanding conditions.

Download the Case Study

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Case study document for DuPont Semiconductor Production Line Expansion, detailing project overview, job specifications, and solutions by APEX Mechanical & Fabrication, with text and industrial images.

This case study highlights innovative fabrication strategies, seamless integration, and award-winning results achieved with fewer labor hours and zero safety incidents.

Four large, insulated metal pipes run parallel and turn at right angles near a ceiling with exposed beams and skylights.

About APEX

APEX Mechanical & Fabrication is the region’s preferred supplier for mechanical services and shop fabrication. We’re known for delivering excellent work, building rewarding careers, and putting safety, quality, and service at the core of everything we do. Our proven, end-to-end approach, driven by a dedicated team, optimizes cost, safety, quality, and schedule for every client, every time.